大岗山水电站左岸缆机平台边坡稳定分析 被引量:1

Slope stability analysis of left bank cable crane platform of Dagangshan Hydropower Station
下载PDF
导出
摘要 大岗山水电站坝区边坡具有高地应力、高地震烈度、卸荷风化强烈的显著特点。为确保缆机平台边坡安全,采用二维弹塑性有限元方法模拟左岸缆机平台PLⅢ-PLⅢ剖面边坡开挖施工过程,对开挖过程中的应力变形特征及稳定性进行计算分析,研究边坡在逐层开挖逐层支护过程中的应力变形演化规律、预应力锚索对边坡的加固支护效果以及对边坡稳定性的影响。计算结果表明,在预应力锚索的及时加固下,边坡均处于稳定状态。 The slope of Dagangshan Hydropower Station is characterized by high geo-stress,high seismic intensity and strong unloading and weathering effect.For guaranteeing the slope safety at cable platform,we simulate the excavation process of PLIII-PLIII cross-section by 2D FEM,and obtain the stress-strain characters and stability of the slope.The stress-strain evolution law of slope under excavation-supporting alternation and supporting effect of pre-stress cable to slope stability are investigated.The results reveal that the slope is in safe status by reinforcement of pre-stress cable in time.
出处 《人民长江》 北大核心 2011年第14期42-45,63,共5页 Yangtze River
关键词 边坡稳定 弹塑性有限元 加固支护 大岗山水电站 slope stability elasto-plastic FEM supporting reinforcement Dagangshan Hydropower Station
  • 相关文献

参考文献3

二级参考文献14

共引文献24

同被引文献1

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部