摘要
结合既有信号设备情况,对既有线CTCS-2级配套改造存在的问题进行分析,根据相关设计标准及规范,提出既有线CTCS-2级列控系统改造工程设计方案,并对设计方案中重点、难点问题进行详细分析,提出相应解决方案。
Considering the conditions of existing signal equipment, the problems of how to reconstruct the CTCS-2 train control system for existing lines are analyzed. According to the design standard and specif ication, the reconstruction project scheme of the CTCS-2 train control system for existing lines is put forward. A detailed analysis of the key problems of the scheme is carried out, and the corresponding solutions are proposed.
出处
《铁路通信信号工程技术》
2011年第3期15-18,共4页
Railway Signalling & Communication Engineering
关键词
既有线
CTCS-2级列控系统
临时限速
改造工程
existing line
CTCS-2 train control system
temporary speed restriction
reconstruction project