拉西瓦水电站1号主变C相高压侧GIB单相接地故障原因分析及处理方法 被引量:4

Failure Reason Analysis and Treatment Process of C-phase High-pressure Side GIB Single Phase Groundingfor 1~# Main Transformer in Laxiwa Hydropower Station
下载PDF
导出
摘要 拉西瓦水电站电气主接线为发电机—变压器联合单元接线,发电机出口装设发电机断路器,发电机机端电压18 kV,主变压器采用3台单相变组成三相组,750 kV侧2串3/2断路器和1串双断路器接线。文章就拉西瓦水电站1号主变压器高压侧C相G IB发生单相接地故障现象进行分析,提出了处理方法和防范对策。 Main electrical wiring of Laxiwa hydropower station is generator transformer joint unit wiring,installing circuit breakers on generator outlet,terminal voltage of generater is 18kV,and main transformer adopts 3 sets of single phase changing into three phase.The paper analyzes the failure of C phase high pressure side GIB single phase grounding for 1# Main Transformer in Laxiwa hydropower station,and puts forward processing method and countermeasures.
作者 张严
出处 《青海电力》 2011年第2期49-50,63,共3页 Qinghai Electric Power
关键词 主变压器高压侧 单相接地故障 原因分析 处理方法 main transformer high pressure side single phase grounding failure reason analysis processing method
  • 相关文献

同被引文献12

引证文献4

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部