摘要 同步相量测量装置(PMU)已广泛应用于中国电网.智能变电站过程层设备与间隔层设备的信息交互对PMU提出了新的要求.介绍智能变电站PMU应实现的基本功能、符合IEC 61850标准的PMU建模、采样值报文解析、时间同步、MMS服务及信息共享的内容,给出智能变电站内PMU的实现方法和应用方案,并提出完善IEC 61850的建议,为智能电网PMU装置的应用提供参考. Phasor measurement units(PMU) have greatly used in China for a long time.The information exchange between the bay devices and the process devices proposes some new requests for PMU.This paper introduces the PMU basic functions,PMU modeling with IEC 61850,sample values message resolution,time synchronization,MMS service and information sharing.It is also presented that PMU implementation methods and application scheme.Some advices for IEC 61850 improving are proposed.They provide a reference for PMU devices application in smart grids.
出处 《电力科学与技术学报》 CAS 2011年第2期37-43,共7页 Journal of Electric Power Science And Technology
关键词 智能变电站 PMU IEC 61850 时间同步 smart substation PMU IEC 61850 time synchronization
  • 相关文献

参考文献12

  • 1刘振亚..智能电网技术[M].北京:中国电力出版社,2016:382.
  • 2陈实,许勇,王正风,等.电网实时动态监测技术及应用[M].中国水利水电出版社,2009. 被引量:1
  • 3国家电力调度通信中心.电力系统实时动态监测系统技术规范[M].北京:中国电力出版社,2009. 被引量:1
  • 4高翔编著..数字化变电站应用技术[M].北京:中国电力出版社,2008:287.
  • 5IEC61850-9-1.变电站通信网络和系统第9-1部分特定服务映射(SCSM)单向多路点对点串行通信链路上的采样值[S]. 被引量:1
  • 6IEC61850-9-2.变电站通信网络和系统第9-2部分特定通信服务映射(SCSM)映射到ISO/IEC8802-3的采样值[S]. 被引量:1
  • 7赖登群,袁嫣红.基于IEC61850-9-1的合并单元的设计[J].浙江理工大学学报(自然科学版),2009,26(1):114-119. 被引量:5
  • 8莫峻,谭建成.基于IEC 61850-9-2的合并单元研究[J].现代电力,2009,26(4):10-14. 被引量:13
  • 9IEC 61850 9-2 (LE). Implementation guideline of dig- ital interface to instrument transformers using IEC 61850 - 9- 2[S]. 被引量:1
  • 10IEC 61850--90--5. Use of IEC 61850 to transmit syn- chrophasor information according to IEEE C37. 118[S]. 被引量:1