悬臂施工预应力混凝土连续梁桥合拢方案设计 被引量:4

Closure Design For Cantilever Prestressed Concrete Continuous Beam Bridge
下载PDF
导出
摘要 针对某三跨悬臂施工连续梁桥的工程情况,就合拢块的施工方案确定和施工步骤的实施过程做了具体阐述。介绍了该桥合拢段施工时刚性支撑骨架的安装、合拢段锁定、混凝土浇筑等施工工艺,并进行了合拢段刚性支撑骨架在温度作用下的受力分析。 According to the engineering case of a three span continuous bridge with cast-in-place cantilever construction method,the construction method and construction program of closing segment are described in this paper.The construction technology such as the installation for rigid support frame and the fixing for closing segment,and the cast-in-place technology of concrete are also described in detail.The inner force of the rigid support frame under temperature load are specially analyzed.
作者 周承国
出处 《神华科技》 2011年第3期85-87,共3页 Shenhua Science and Technology
关键词 连续梁桥 合拢方案 温度内力 悬臂施工 Continuous beam bridges Closing scheme Temperature force Cantilever construction method
  • 相关文献

参考文献4

二级参考文献2

  • 1铁道部第三工程局.桥涵(中)[M].北京:中国铁道出版社,1999.16-40. 被引量:1
  • 2范立础.桥梁工程(上)[M].北京:人民交通出版社,1986.422-442. 被引量:1

共引文献4

同被引文献8

引证文献4

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部