摘要
在矿井提升系统安装结束、正式投入使用前,应对矿井提升机进行调试和试运转,通过检测以判断系统是否达到预期的设计目标。文章以2JK-3/11.5型提升机为例,介绍了矿井提升机的调试与试运转具体方法及步骤。
After hoisting system installation termination and before formally put into hoist should be given a test run and debugging, judging whether the design objective achieved or not by testing. The paper introduces the specific methods and steps of and test run of mine hoist through taking hoister of type 2JK-3/11.5 as an example.