期刊文献+

基于AHP的桥梁工程预制梁厂选址模型研究 被引量:4

Research on the AHP Based Site Selection Model of the Prefabricated Beam Plant in Bridge Engineering
下载PDF
导出
摘要 预制梁是大型桥梁工程的一个重要构件,因此预制梁厂的设计和布置也是桥梁工程施工的一个重要环节,而该环节首要解决的就是预制梁厂的选址。分析了影响预制梁厂选址的因素,建立了基于AHP的选址评价模型,为桥梁施工单位进行预制梁厂选址提供了一种有效的方法。 The prefabricated beam is one of the important components of a large bridge, so that the design and arrangement of the prefabricated beam plant is an important link in bridge engineering which gives top priority to the site selection of the prefabricated beam plant. This paper analyzes the factors influencing on the site selection of the prefabricated beam plant, establishes an evaluation model of the Site Selection based on the AHP, and provides an effective method for the bridge construction organization to locate the prefabricated beam plant.
作者 郭卫东
出处 《洛阳理工学院学报(自然科学版)》 2011年第2期32-35,共4页 Journal of Luoyang Institute of Science and Technology:Natural Science Edition
关键词 桥梁工程 预制梁厂 层次分析法 选址 bridge engineering prefabricated beam plant analytic hierarchy process site selection
  • 相关文献

参考文献4

二级参考文献5

共引文献30

同被引文献35

  • 1李海江,徐筱婷,蒋文权,刘建平.公路施工现场预制梁场选址影响因素分析[J].中国水运(下半月),2010,10(5):174-175. 被引量:5
  • 2马培新,王爱梅.浅谈客运专线箱梁预制场选址、布置与设备配置[J].筑路机械与施工机械化,2007,24(11):44-45. 被引量:2
  • 3Eldin, N., Sui, D.A COM-based Spatial Decision Support System for Industrial Site Selection [J]. Journal of Geographic Information and Decision Analysis, 2003,7 (02) : 72 -92. 被引量:1
  • 4J.RonaldEastman, HongJiang, James Toledano. Multi-criteria and multi-objective decisionmaking for land allocation using GIS [J]. Multi-criteria Analysis for Land-Use Management Environment & Management (09), 1995 : 227-251. 被引量:1
  • 5Carver, S.J.Integrating Multi-Criteria Evaluation with Geographical Information Systems[J].lntemational journal of Geographical Infor-mation Systems, 1991,5 (03) : 321-339. 被引量:1
  • 6Tversky A. Intransitivity of preferences [J].Psychological Review, 1969,76 (1):31-48. 被引量:1
  • 7Gomes L.F.A.M,Lima M.M.P.P. TODIM: Basics and application to multi-criteria ranking of projects with environmental impacts[J]. Foundations of Computing and Decision Sciences, 1992, 16 (04) : 113-127. 被引量:1
  • 8Mohamed N. A. A.,Mohd S. S. A.,Taksiah A. M.,Ahmad S. Y.,Mohd H.H.Statistical Evaluation of pre-selection criteria for industrialized building system (IBS)[J].Joumal of Civil Engineering and Manag- ement, 2013, 19: 131-140. 被引量:1
  • 9Mohamed N. A. A., Mohd N. M. N. M. S. S. A., Tee T. I Val- idating Site Selection Criteria for Precast Manufacturing Plant in Malaysia[J].Australian Journal of Basic and Applied Sciences,2014, 8 (05) : 462-468. 被引量:1
  • 10Ying C., GO l E. O., David R. R.Sustainable performance crite- ria for construction method selection in concrete buildings[J]. Aut- omation in Construction, 2010, 19:235 - 244. 被引量:1

引证文献4

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部