海外工程建设项目总承包应对金融危机的实践 被引量:2

Practice Coping with Financial Crisis in Overseas Engineering Construction EPC Contract Project
下载PDF
导出
摘要 文章结合土库曼斯坦巴格德雷合同区域A区块地面集输工程项目,分析了海外总承包项目受金融危机影响的因素,并通过采取以收定支、控制项目资金流量、加强项目预算、集中力量抓采购、加强进度款催交和索赔、加大当地分包量、加大雇用当地员工等应对措施,最大限度地降低了项目的风险和损失,确保了工期。 Associated with the surface gathering project at A Block of Bagrad,Turkmen,the factors affecting overseas EPC contract project by financial crisis are analyzed.The following countermeasures are taken to cope with financial crisis: expenditure determined by revenue;controlling project fund flow;enhancing project budget and procurement managements;calling in arrears of project progress and counterclaim;increasing local subcontract quantity and local employees.Thus,risk and loss of the EPC project are reduced to the greatest extent and the project schedule is guaranteed.
作者 陈意深
出处 《石油工程建设》 2011年第3期74-75,88,共2页 Petroleum Engineering Construction
关键词 海外工程 总承包项目 金融危机 风险防范 overseas project general contract financial crisis risk prevention
  • 相关文献

参考文献2

  • 1徐传谌,李政.中国企业如何应对金融危机[M].北京:中国经济出版社,2010. 被引量:1
  • 2徐洪才.中央企业应对金融危机报告2010[M].北京:北京高教音像出版社,2008.. 被引量:1

同被引文献11

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部