特大型灯泡贯流式机组导水机构安装新工艺 被引量:3

New installation technology for distributor of super-large bulb turbine unit
下载PDF
导出
摘要 针对大型灯泡贯流式水轮发电机组导水机构尺寸比较大,安装过程中极易发生吊装变形问题,结合桥巩水电站特大型灯泡贯流式水电站机组导水机构安装方法,提出两个创新工艺:第一,将导水机构的装配与现场安装两个步骤分离,先将导水机构预装,再整体吊装。第二,将安装定位架与导水机构内、外环连接,既控制了内、外环轴向位移,又控制了内、外环径向位移和变形。这样不仅大大减少吊装变形,还减少了现场安装的耗时。 In accordance with the problem from the lifting deformation on the distributor of super-large bulb turbine unit during the installation due to its larger size, two new installation technologies are put forward herein in combination with the method for the installation of the distributor of the super-large bulb turbine unit in Qiaogong Hydropower Station ; i.e. ( 1 ) separating the installation into two steps of preassembly and site installation respectively, with which the distributor is preassembled at first and then is integrally lifted and installed; (2) the positioning rack for the installation is connected to the outer ring and the inner ring of the distributor and then the axial displacements, radial displacements and deformations of rings are all controlled. In this way, not only the lifting deformation of the distributor is largely reduced, but the time-consumption of the site installation concerned is also decreased.
出处 《水利水电技术》 CSCD 北大核心 2011年第6期56-58,共3页 Water Resources and Hydropower Engineering
关键词 导水机构 安装技术 贯流式水轮机组 新工艺 distributor installation technology. bulb turbine unit new technology
  • 相关文献

参考文献6

同被引文献21

引证文献3

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部