2Scholl A, Becker C.State of the Art Exact and Heuristic Solution Procedures for Simple Assembly Line Balancing [J].European Journal of Operational Research, 2006, 168 (3): 666-693. 被引量:1
3Scholl A. Balancing ands sequencing of assembly lines[M].2nd ed.Heidelberg,Germany:Physica-Verlag, 1999:34-35 被引量:1
4Ponnambalam S G, Aravindan P, Mogileeswamaidu G. A comparative evaluation of assembly line balancing heuristics[J]. International Journal of Advanced Manufacturing Technology, 1999.15(8):577-586 被引量:1
5Driscoll J, Thilakawardana D. The definition of assembly line balancing difficulty and evaluation of balancing solution quality[J]. Robotics and Computer Integrated Manufacturing,2001.17: 81-86 被引量:1
6Bartholdi J. Balancing two-sided assembly lines: A case study [J].International Journal of Production Research,1993.31: 2447-2461. 被引量:1
7Lee Tae Ok, Kim Yeongho, Kim Yeo Keun. Two-sided assembly line balancing to maximize work relatedness and slackness[J], Computers & Industrial Engineering,2001.40: 273-292 被引量:1
8Dorigo M,Blum C. Ant colony optimization theory: survey[J]. Theoretical Computer Science,2005.344(2-3):243-278 被引量:1
9Merkle D, Middendorf M. Ant colony optimization with global pheromone evaluation for scheduling a single machine [J]. Applied Intelligence,2003.18(1): 105- 111 被引量:1
10Vilarinho, Simaria. ANTBAL: An ant colony optimization algorithm for balancing mixed-model assembly lines with parallel workstations[J]. International Journal of Production Research,2006.44:291-303 被引量:1
3Rabbani M,Kazemi S M,Manavizadeh N. Mixed Model U-line Balancing Type-1 Problem:A New Approach [J]. Journal of Manufacturing Systems,2012,31 : 131-138. 被引量:1
4Falkenauer E. Line Balancing in the Real World[C]//International Conference on Product Lifecycle Management. Lyon: Is. n. ],2005:360-370. 被引量:1
5Purnomo H D,Wee H M. Maximizing Production Rate and Workload Balancing in a Two-sided Assembly Line Using Harmony Search[J]. Computers Industrial Engineering, 2014,76 : 222-230. 被引量:1