摘要
详细介绍了长春热电二厂 1、2 号机组自动化系统的技术改造情况,包括系统改造范围、硬件配置、软件功能及系统改造后所达到的技术水平,并对改造后系统的准确性。
This paper described the automation technique renovation of boiler\|turbine unit No. 1 and 2 in Changchun No. 2 Thermal Power Plant. The renovation includes system retrofitting, hardware configuration, software function and the technical indexes of the system. The accuracy of the system and the optimal control of boiler\|turbine performance after renovation are analyzed.