摘要
本文以某大厦原设计使用功能为宾馆,改造为自助KTV包厢,导致二层局部挑梁构件承载力不足,针对现场情况和工程特点,提出一种加固处理挑梁的新方法。
In this paper,taking the reconstruction from hotel into self-service KTV balcony of a building as an example,which led to lacking of bearing capacity of some cantilever beams in second floor,aiming at site-specific conditions and engineering characteristics,a new reinforcement method is proposed.
出处
《福建建设科技》
2011年第3期19-20,共2页
Fujian Construction Science & Technology
关键词
加固
拉杆
改变受力状态
Reinforcement
tension rod
stress state change