基于Petri网的原油处理生产作业计划油罐动态分配分析 被引量:3

Dynamic tank assignment analysis for short-term scheduling of crude oil operations by using Petri net model
原文传递
导出
摘要 石化炼油企业采用递阶方法进行调度,以使短期调度方法在生产运作中切实可行.在上层,企业根据市场需求产生一个目标炼油计划.在下层,企业得到一个详细调度以实现目标炼油计划.在这个过程中,如何动态分配油罐将起到至关重要的作用,同时也是生产运作中的难题.为了解决这个难题,建立Petri网模型描述原油处理生产过程的行为特征.基于该模型,分析了油罐分配对目标炼油计划可实现性的影响,鉴别出那些使系统进入不可行状态的操作,并对其进行调整.这样,通过避免这样的不可行操作而提出一种实现目标炼油计划的油罐动态分配方法.最后,用一个工业实例验证了提出的方法的应用. To make a short-term scheduling method practical, it can be done in a hierarchical way. At the upper level, a target refining schedule is created according to market demands. Then, at the lower level, a detailed schedule is to realize the target refining schedule. To make the target refining schedule realized, the key is how to dynamically assign the tanks in the plant. To solve the realizability problem of target refining schedule, a Petri net model is developed to describe the behaviors of the system. Based on this model, how tank assignment affects the realizability of a target refining schedule is analyzed and operations that lead to an infeasible state are identified and adjusted. Thus, a dynamic tank assignment method is proposed to realize a target refining schedule by avoiding such operations. A practical industrial case problem is used to show the application of the proposed method.
出处 《系统工程理论与实践》 EI CSSCI CSCD 北大核心 2011年第5期976-985,共10页 Systems Engineering-Theory & Practice
基金 国家自然科学基金(60474061)
关键词 炼油 生产作业计划 PETRI网 oil refining short-term scheduling Petri net
  • 相关文献

参考文献15

  • 1Bonner & Moore. RPMS (Refinery and Petrochemical Modeling System): A System Descriptive[M]. Hoston TX, USA: Bonner & Moore Management Science, 1979. 被引量:1
  • 2PIMS System Reference, Version 11.0[M]. Cambridge, MA, USA: Aspen Technology Inc, 1999. Rigby B, Lasdon L S, Waxen A D. The evolution of Texaco's blending systems: From OMEGA to StarBlend[J] Interface, 1995, 25(5): 64-83. 被引量:1
  • 3Shah N. Mathematical programming techniques for crude oil scheduling[J]. Computers and Chemical Engineering 1996, 20(Suppl): 1227-1232. 被引量:1
  • 4Shah N. Mathematical programming techniques for crude oil scheduling[J]. Computers and Chemical Engineering, 1996, 20(Suppl): 1227-1232. 被引量:1
  • 5Lee H, Pinto J M, Grossmann I E, et al. Mixed integer linear programming model for refinery short-term scheduling of crude oil unloading with inventory management[J]. Industrial and Engineering Chemical Research, 1996, 35(5): 1630-1641. 被引量:1
  • 6Moro L F L, Pinto J M. Mixed-integer programming approach for short-term crude oil scheduling[J]. IndustriM and Engineering Chemistry Research, 2004, 43(1): 85-94. 被引量:1
  • 7Pinto J M, Joly M, Moro L F L. Planning and scheduling models for refinery operations[J]. Computers and Chemical Engineering, 2000, 24(9): 2259-2276. 被引量:1
  • 8Glismann K, Gruhn G. Short-term scheduling and recipe optimization of blending processes[J]. Computers and Chemical Engineering, 2001, 25(4/6): 627-634. 被引量:1
  • 9Rejowski R, Pinto J M. Scheduling of a multiproduct pipeline system[J]. Computers and Chemical Engineering, 2003, 27(8/9): 1229-1246. 被引量:1
  • 10伍乃骐,白丽平.炼油生产计划和调度优化的研究[J].计算机集成制造系统,2005,11(1):90-96. 被引量:31

二级参考文献35

  • 1姚建初,刘伯龙,周济,余俊.连续过程工业生产调度专家系统[J].交通与计算机,1996,14(1):20-23. 被引量:5
  • 2褚健 孙优贤.流程工业综合自动化技术发展的思考.制造业信息化,2002,31:24-24. 被引量:11
  • 3SYMONDS G H. Linear programming: the solution of refinery problems[M]. New York, NY, USA: Esso Standard Oil Company, 1955. 被引量:1
  • 4HONKOMP S J, LOMBARDO S, ROSEN O, et al. The curse of reality-why process scheduling optimization problems are difficult in practice[J]. Computers and Chemical Engineering,2000,24 : 323 - 328. 被引量:1
  • 5MORO L F L. Process technology in the petroleum refining industry current situation and future trends[J]. Computersand Chemical Engineering, 2003,27 (8- 9) : 1303- 1305. 被引量:1
  • 6SIMON J D,AZAMA H M. Exxon experience with large scale linear and nonlinear programming applications[J]. Computersand Chemical Engineering, 1983,7(5) :605-614. 被引量:1
  • 7ADHYA N, TAWARMALANI H M, SAHINIDIS N V. A lagrangian approach to the pooling problem[J]. Industrial and Engineering Chemical Research, 1999,38(5) : 1956- 1972. 被引量:1
  • 8PORN R, HARJUNKOSKI I ,WESTERLUND T. Convexification of different classes of non-convex MINLP problems[J]. Computers and Chemical Engineering, 1999,23(3) :439-448. 被引量:1
  • 9ZHANG J,ZHU X X, TOWLER G P. A simultaneous optimization strategy for overall integration in refinery planning[J].Industrial and Engineering Chemical Research, 2001,40(12):2640-2653. 被引量:1
  • 10Bonner & Moore. RPMS (Refinery and Petrochemical Modeling System):a system descriptive[M]. Houston, TX, USA: Bonner & Moore Management Science,1979. 被引量:1

共引文献30

同被引文献37

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部