摘要 介绍地铁盾构隧道始发后距离端头井约18 m处,下方斜穿外径3.57 m,壁厚285 mm的大型混凝土污水管(污水管与盾构隧道竖向结构净间距约0.52 m),然后向南穿越七里河。在进行有限元计算,并进行各工况沉降分析后,采取相关设计及施工措施,盾构施工得以安全通过,地面和污水管沉降量小;并采取相应的减振设计,减少地铁运营阶段对污水管的影响。 After leaving the shaft at a distance of about 18.0 m,the shield obliquely under-passed a large concrete sewage pipe with outer diameter 3.57 m and 285mm in thickness.The vertical clearance distance from shield tunnel to sewage pipe was 0.52m.Based on finite element analysis for different cases of settlements,some measures in design and construction for shield tunneling were adopted which resulted in the safe crossing of the shield under the pipe with little settlements on ground surface.In order to reduce the influence of subway in operation phase on the sewage pipe,some damping design measures were adopted.
作者 梅江兵
出处 《都市快轨交通》 2011年第2期76-79,共4页 Urban Rapid Rail Transit
关键词 城市轨道交通 盾构 污水管 有限元计算沉降 urban rail transit shield sewage pipe finite element calculation settlement
  • 相关文献

参考文献5

二级参考文献4

  • 1陶龙光 巴肇伦.城市地下工程[M].北京:科学出版社,1999.. 被引量:5
  • 2[1]中铁隧道勘测设计院有限公司.南京地铁软流塑地层浅埋暗挖隧道和大跨度浅埋暗挖隧道群穿越旧建筑物群施工技术总报告[R].洛阳:中铁隧道勘测设计院有限公司,2003. 被引量:1
  • 3[2]邝建政.岩土注浆理论与工程实践[M].北京:科学出版社,2001. 被引量:2
  • 4[4]梁炯鋆.中国锚固与注浆工程实录选[M].北京:科学出版社,1995. 被引量:1

共引文献11

同被引文献25

引证文献5

二级引证文献39

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部