齐岳山隧道F11断层区域横通道进正洞超前帷幕注浆施工方案 被引量:1

Advanced Curtain Grouting Construction Scheme for the Main Tunnel through Cross Entryway within F11 Fault Area of Qiyueshan Tunnel
下载PDF
导出
摘要 以齐岳山隧道F11断层区域横通道进正洞施工为例,介绍了超前帷幕注浆施工技术在复杂地质条件下的应用,阐述了大断层区域内超前帷幕注浆技术的注浆设计、钻探注浆情况分析、注浆效果评定、开挖揭示对比,为断层破碎带、软弱围岩施工提供了一定的经验借鉴。 Taking the construction of the main tunnel through cross entryway within F11 fault area of Qiyueshan Tunnel as an example,this paper introduces the application of advanced curtain grouting construction technology under complex geological conditions,expounds the grouting design,drilling/grouting situation analysis,grouting effect evaluation and excavation reveal/contrast of advanced curtain grouting construction technology adopted in large fault areas,which provide some experiences and references for the construction of fault fracture zone and weak surrounding rock.
作者 王建军
出处 《科技情报开发与经济》 2011年第11期208-210,共3页 Sci-Tech Information Development & Economy
关键词 齐岳山隧道施工 F11断层区域 超前帷幕注浆施工技术 施工方案 construction of Qiyueshan Tunnel F11 fault area advanced curtain grouting construction technology construction technology
  • 相关文献

参考文献4

二级参考文献1

  • 1肖书安.瑞士隧道工程中的地质超前预报测量[A]..见:中瑞公路隧道技术交流文集[C].北京:人民交通出版社,2001.. 被引量:2

共引文献68

同被引文献1

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部