高速铁路高架站箱梁利用既有梁场进行预制架设方案的探讨 被引量:2

Study on Prefabricated Erection of Elevated Box Beam with Existing Beam Field in High-speed Railway
下载PDF
导出
摘要 介绍了高速铁路高架站到发线简支箱梁利用既有梁场进行预制架设施工方案,根据现有施工设备及节点工期要求,为了加快施工进度,消除和减少对后期工程的影响,且减少项目投资的目的,对高架站到发线箱梁利用既有设备改造后进行预制架设。 The paper introduces the construction plan for prefabricated erection of high-speed railway projects from Elevated box beam to departure line simple box girder with existing beam field.Under the existing schedule node requirements and construction equipment,in order to speed up the construction schedule,eliminate and reduce the impact on later works,as well as to reduce investment,the paper also describes in detail the use of modified existing equipments for prefabricated erection.It is of good reference and research value for similar design and construction.
作者 姚兵
出处 《铁道建筑技术》 2011年第4期14-16,27,共4页 Railway Construction Technology
关键词 高速铁路 高架车站 箱梁预制 架设设备 既有梁场 high-speed railway elevated station prefabricated box beam erection equipment existing beam field
  • 相关文献

参考文献3

  • 1铁建设[2006]181号铁路架桥机架梁暂行规程[S]. 被引量:4
  • 2铁科技函[2004]120号客运专线预应力混凝土预制梁暂行技术条件[s]. 被引量:5
  • 3通桥(2008)2322-11时速350km客运专线铁路无砟轨道后张法预应力混凝土简支箱梁(双线)[S]. 被引量:1

共引文献7

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部