摘要 结合深圳地铁5号线怡黄盾构区间下穿黄贝岭小区房屋建筑的施工经验,重点介绍了盾构在不良地层中下穿既有建筑物时采用地下掘进参数控制、地面加固注浆、洞内加固措施及监控量测信息化施工等的综合施工技术措施。 In combination with the construction experience of Shenzhen No.5 subway line Yi-Huang shield area under buildings in Huangbeiling district, the comprehensive construction technologies such as underground development parameter control, ground reinforcement grouting, tunnel inside reinforcement measures and monitoring measurement and information-based construction etc. were introduced emphatically which were adopted for shield machine development in unfavorable stratum under the existing building.
作者 王中华
出处 《工程建设》 2011年第2期33-37,共5页 Engineering Construction
关键词 地铁 盾构 施工技术 既有建筑物 subway shield construction technology existing building
  • 相关文献

参考文献3

  • 1竺维彬,鞠世健等著..复合地层中的盾构施工技术[M].北京:中国科学技术出版社,2006:247.
  • 2崔玖江著..隧道与地下工程修建技术[M].北京:科学出版社,2005:339.
  • 3张风祥,朱合华,傅德明.盾构隧道[M].北京:人民交通出版社,2004. 被引量:36

共引文献35

同被引文献8

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部