塔式集束立管安装方案研究

Installation Method of Bundled Hybrid Offset Riser
下载PDF
导出
摘要 对不同类型的塔式集束立管的海上安装方案进行了分析研究,为塔式集束立管在中国南海的应用提供参考。 This paper gives a general introduction of installation method of Integral BHOR and Separated BHOR,provide a reference for application of the South China Sea.
出处 《中国海洋平台》 2011年第2期13-17,36,共6页 China offshore Platform
基金 国家科技重大专项<自由站立式立管工程技术研究>项目资助 项目编号:2008ZX05030-005-13
关键词 塔式集束立管 浮力筒 海上安装 bundled hybrid offset riser buoyancy can installation
  • 相关文献

参考文献14

  • 1Andrew B, Eyles T. Global Analysis of Single Leg Hybrid Risers, IV European Conference on Computational Mechanics[C], ECCM 2010,Palais des Congres, Paris, France, May 16-21, 2010:1-12. 被引量:1
  • 2Song R X. Overview of Deepwater Pipeline and Riser Technology State-of-the-Art and Tendency[C]. Overview of Deepwater Pipelines and Risers Technology Worldwide for CNOOC 863, Houston,2004: 13. 被引量:1
  • 3宋儒鑫,王金英.海洋集束管道--油田内部输送的一种精明解决方案[J].中国造船,2003,44(z1):105-120. 被引量:5
  • 4Francisco E R. New Riser Development-A Free Standing Hybrid Riser for Deep Waters[J], Brazil Oil and Gas, Issue 3.- 29-32. 被引量:1
  • 5Sworn A. Hybrid Riser Towers From An Operatogs Perspective[C]. Proceedings of Offshore Technology Conference , Houston,USA,2005, OTC17397 : 1-2. 被引量:1
  • 6Saintmarcoux J F, Rochereau M. Hybrid Riser Tower: from Functional Specification to Cost per Unit Length[C], DOT XIII Rio de Janeiro-Oct. 18, 2001. 被引量:1
  • 7Mark D, Andre B. Riser Towers-room for improvement[J]. Offshore Engineer, September 2005:65-66. 被引量:1
  • 8Giovanni C. Bundle Hybrid Offset Riser (BHOR) : An Advanced Solution for Improved Riser Tower Systems Installa- bility and Operability in Deepwater West of Africa[C], Proceedings of Offshore Technology onference, Houston, Texas, U. S. A., 3-6 May 2004,OTC16630:5-7. 被引量:1
  • 9Francis D, Charles Z, Daniel de la C, Gr6goire de R, Jean L. Design Of The Greater Plutonio Riser Tower[C], Pro- ceedings of the ASME 2009.28th International Conference on Ocean, Offshore and Arctic Engineering, ngineering, May 31-June 5, 2009. 被引量:1
  • 10Acergy S A. Principal Executive Offices[C], Acergy Annual Report and Accounts 2007, March 2008:10-18. 被引量:1

二级参考文献17

  • 1[1]ABS (2001): "Guide for Building and Classing Undersea Pipelines and Risers" 被引量:1
  • 2[2]API RP 1111 (1998): "Design, Construction, Operation, and Maintenance of Offshore Hydrocarbon Pipelines-Limit State Design" 被引量:1
  • 3[3]Bai, Y. and Song, R. "Reliability-Based Limit-State Design and Re-qualification of Pipelines",Proceedings of the 17th International Conference on Offshore Mechanics and Arctic Engineering,OMAE98-2849, July, 1998, Lisboa, Portugal 被引量:1
  • 4[4]Bai, Y. and Song, R., "Fracture Assessment of Dented Pipes with Cracks and Reliability-Based Calibration of Safety Factor", the International Journal of Pressure Vessel and Piping, 74 (1997) pp. 221-229,Elsevier Science Limited, 1998 被引量:1
  • 5[5]BSI BS 8010 (1993): "Code of Practice for Pipeline -Part 3. Pipeline Subsea: Design, Construction and Installation" 被引量:1
  • 6[6]DNV OS Fi01 (2000): "Submarine Pipeline Systems" 被引量:1
  • 7[7]Jiao, G. et al (1996): "The SUPERB project: Wall Thickness Design Guideline for Pressure Containment of Offshore Pipelines", Proceedings of OMAE' 96 被引量:1
  • 8[8]Song, R., "Pipelines and Risers for Deepwater Application", Proceedings of China Offshore Technology Conference and Journal of China Ship Building, Nov. 2002 被引量:1
  • 9[9]Song, R., "Design of Riser System for Bundled Towing and Unbundled Installation", Proceedings of the IBC Latest Developments in,Deep and Ultra Deepwater, Houston, USA, Oct. 24th, 2001 被引量:1
  • 10[10]Song, R., Clausen, T and Stuijk, P., "Design and Installation of a Banded Riser System for a North Sea Application", Proceedings of the Offshore Technology Conference (OTC 2001), Houston, USA, April-May, 2001 被引量:1

共引文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部