摘要
根据已有的实测资料,对永定新河河道的潮流及其输沙特性进行初步分析,试图探求淤积机理.建立淤积量估算方法.
Based on the measured data, the properties of tidal flow and sediment transport of the New Yong-ding River are analyzed; the deposition mechanism is tried to found out; and finally, a forecast method of deposition is established.
出处
《水道港口》
1999年第3期19-26,共8页
Journal of Waterway and Harbor
关键词
潮汐
含沙量
挟沙能力
淤积
河道
tidal flow concentration carrying capacity deposition