对向家坝水电站二期土建及金属结构安装工程Ⅱ标段施工期间的环境因素进行识别、评价,采取有针对性的管理措施和施工措施,开展好施工期间的环境保护工作。
The environmental factors during the construction of earth work of the 2-nd stage of Xiangjiaba Hydropower Plant and the installation of metal sturctures in the 2-nd section are judged and estimated.The corresponding techniques and measures are applied in the management and construction to protect the environment in the course of construction.