期刊文献+

Prediction of Debris-flow Danger Area by Combining Hydrological and Inundation Simulation Methods 被引量:32

Prediction of Debris-flow Danger Area by Combining Hydrological and Inundation Simulation Methods
下载PDF
导出
摘要 Debris flows have caused serious human casualties and economic losses in the regions strongly affected by the Ms8.0 Wenchuan earthquake of 2oo8. Debris flow mitigation and risk assessment is a key issue for reconstruction. The existing methods of inundation simulation are based on historical disasters and have no power of prediction. The rain- flood method can not yield detailed flow hydrograph and does not meet the need of inundation simulation. In this paper, the process of water flow was studied by using the Arc-SCS model combined with hydraulic method, and then the debris flow runoff process was calculated using the empirical formula combining the result from Arc-SCS. The peak discharge and runoff duration served as input of inundation simulation. Then, the dangerous area is predicted using kinematic wave method and Manning equation. Taking the debris flow in Huashiban gully in Beichuan County, Sichuan Province, China on 24 Sep. 2oo8 as example, the peak discharge of water flow and debris flow were calculated as 35.52 m3·s-1 and 215.66 m3·s-, with error of 4.15% compared to the measured values. The simulated area of debris-flow deposition was 161,500 m2, vs. the measured area of 144,097 m2, in error of 81.75%. The simulated maximum depth was 12.3 m, consistent with the real maximum depth between lO and 15 m according to the field survey. The minor error is mainly due to the flow impact on buildings and variations in cross-section configuration. The present methodology can be applied to predict debrisflow magnitude and evaluate its risk in other watersheds inthe earthquake area.
作者 CUI Peng
出处 《Journal of Mountain Science》 SCIE CSCD 2011年第1期1-9,共9页 山地科学学报(英文)
基金 supported by the National Basic Research Program of China(973 Program)(Grant No.2011CB409902) the National Natural Sciences Foundation of China(Grant No. 40671025)
关键词 Debris flow Arc-SCS model Inundation simulation Risk analysis Wenchuan earthquake 泥石流灾害 危险区预测 模拟方法 水灾 流量过程线 SCS模型 水文 风险评估
  • 相关文献

参考文献5

二级参考文献53

共引文献88

同被引文献295

引证文献32

二级引证文献301

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部