摘要
通过对广州—佛山高速公路扩建工程及北京—珠海高速公路软土地基处理工程的研究,分析了粉喷桩、土应力转化及相互作用,进而对桩的轴向应力、复合地基沉降、作用机理进行了研究,并提出了用粉喷桩复合地基加固软土地基的几点看法。
The stress distribution,stress transformation and the interaction between the soil and the piles are analyzed in this paper,based on the extension engineering of express way from Guangzhou to Foshan and the express way from Beijing to Zhuhai. Further more,the settlement and act mechanism of the com-posite foundation are researched,the method to calculate the composite foundation capacity is advised too.
出处
《地质科技情报》
EI
CAS
CSCD
北大核心
1999年第3期75-78,共4页
Geological Science and Technology Information
基金
横向科研项目!"珠江三角洲软土工程性质与加固改良"
关键词
喷粉桩
复合地基
沉降
承载力
软土地基
加固
powder-injection pile,composite foundation,stress,settlement,bearing capacity