摘要
介绍巨化和浩良河两厂采用宁波远东工艺改造的情况,分析汽耗高的原因,相应的改进措施,以及这些措施实施后的效果。
Introduce adoption of Ningbo-Fareast Process for revamping at Juhua Urea Plant and Haolianghe Urea Plant,analyze the causes for high steam consumption,take the corresponding improving measures,and show the effects after ravamping.
出处
《化工设计通讯》
CAS
2011年第2期57-62,共6页
Chemical Engineering Design Communications
关键词
尿素装置
汽耗
原因
改进
urea plant
steam consumption
cause
improve