5Sturk.R.,Olsson.L.,Johansson.J..Risk and decision analysis for large underground projects,as applied to the Stockholm ring road tuning[J].Tunnelling and Underground Space Technology,1996,11(2):157-164. 被引量:1
6B.Nilsen,A.palmstrom,H.Stille.Quality control of a sub-sea tunnel project in complex ground conditions[J].Challenges for the 21 st century,1992:137-145. 被引量:1
7Soren Degn Eskesen,Per Tengborg,Jorgen Kampmann,et al.Guidelines for Tunneling Risk Management:International Tunneling Association Working Group[J].Tunnelling and Underground Space Technology,2004,19(2):217-237. 被引量:1
4Sturk. R. , Olsson. L. and Johansson. J . . Risk and decision analysis for large underground projects, as applied to the Stockholm ring road tuning[ J]. Tunnelling and Underground Space Technology , 1996,11(2): 157-164. 被引量:1