摘要
深井开拓方案的优选是一个复杂系统,综合考虑影响深井开拓方案的众多因素,采用多层次模糊综合评判法优选确定深井开拓方案的模糊数学模型,建立综合评判矩阵。将该深井开拓方案优选模型应用到某金属矿山,得出了斜坡道加盲竖井开拓方案为最优方案,实践取得了投资少、工期短、安全性好等显著效果,证明该优选方案是有效的,说明了优选方法的可行性。
The optimization of deep-well development scheme is complex problem.Considering the factors influencing the optimization of deep-well development scheme,a fuzzy mathematical model for the optimization of deep-well development scheme was established by use of multi-level fuzzy comprehensive evaluation method,and relative comprehensive evaluation matrix was constructed also.The scheme optimization model of deep-well development was applied to some metal mine,and the determined optimal scheme is ramp and blind shaft development.The implementation of the optimal development scheme resulted better effects such as smaller investment,shorter construction period and good safety,etc.proved that the development scheme is effective,and the scheme optimization method is feasible.
出处
《矿业研究与开发》
CAS
北大核心
2011年第1期6-8,共3页
Mining Research and Development
基金
国家自然科学基金资助项目(50774092)
全国优秀博士学位论文专项资金资助项目(200449)
关键词
深井开拓
方案优选
模糊综合评判
多层次分析
Deep-well development
Scheme optimization
Fuzzy comprehensive evaluation
Multi-level analysis