期刊文献+

镇江市丹徒污水处理厂升级改造工艺设计 被引量:2

Design of Upgrading and Retrofitting Process in Dantu Wastewater Treatment Plant in Zhenjiang
原文传递
导出
摘要 镇江市丹徒污水处理厂升级改造工程的实施规模为1×104m3/d,采用了强化生物处理工艺以及曝气生物滤池(远期建设)/滤布过滤/紫外线消毒深度处理工艺,出水水质达到了《城镇污水处理厂污染物排放标准》(GB 18918—2002)的一级A标准。介绍了升级改造工程的处理工艺选择、工程设计参数、设备配置情况及工程技术经济指标等。 The design capacity of upgrading and retrofitting project of Dantu WWTP in Zhenjiang is 1×10^4m^3/d. The enhanced biological treatment process and the combined process of biological aera- ted filter (forward construction) , cloth-media filter and ultraviolet disinfection are adopted. The effluent quality reaches the first level A criteria specified in Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant ( GB 18918 - 2002). The selection of treatment process, design parameters, equipment collocation and technical economic indexes of the upgrading and reconstruction project are presented.
出处 《中国给水排水》 CAS CSCD 北大核心 2011年第8期40-43,共4页 China Water & Wastewater
关键词 升级改造 百乐克工艺 滤布滤池 upgrading and retrofitting BIOLAK process cloth-media filter
  • 相关文献

参考文献4

二级参考文献5

共引文献126

同被引文献18

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部