摘要
叙述了机采面上副巷电缆过多,拉移时存在费工、费时的问题,自行加工一套电缆滑移装置,通过实践证明,该装置既缩短了电缆的拉移时间,又降低了职工的劳动强度、提高安全性,具有一定的借鉴价值。
Account of apberesis over the surface of the cable, Deputy Lane, pull exists of work, time - consuming issues, self - slip device processing a set of cables, through the practice shows that the device not only shortened the time to pull the cable, but also reduce the labor intensity of workers, improve safety, with some reference value.
出处
《煤》
2011年第3期26-27,共2页
Coal
关键词
电缆
电缆滑移装置
改进
cable
cable slip device
improvement