摘要
提出在投标报价阶段,工程总承包项目中工程设计费用、采购服务费用和施工管理费用的构成及其估算方法,并对直接费用和间接费用之间的关系提出了新的观点。
This paper introduces that in the bidding and proposal stage, the constitution of engineering design cost, procurement service cost, construction management cost of project turnkey contract and its estimation method, new view points are raised for the relation between direct cost and indirect cost.
出处
《化工设计》
CAS
1999年第6期57-59,共3页
Chemical Engineering Design