摘要
结合工程实例,对锚杆静压桩在地基加固中的具体设计方法、施工技术要求进行了介绍,经观测该工程地基加固施工后,沉降得到了良好的控制。
Combining with engineering examples, the paper introduces the factual design methods and the construction technical requirements of the anchor jacked pile in foundation intensification, and indicates that the better control can be achieved in settlement after the construction of the foundation intensification by the observation.
出处
《山西建筑》
2011年第11期73-74,共2页
Shanxi Architecture
关键词
锚杆静压桩
地基
加固
anchor jacked pile, foundation, intensification