月山车站改建工程对丹东水电站的强度影响评估 被引量:1

Influence Assessment of Yueshan Station Rebuilding Project on the Strength of Dandong Hydroelectric Power Station
下载PDF
导出
摘要 采用有限元计算软件建立了丹东水电站的钢筋混凝土岔管及发电机组的三维有限元模型,分析计算了各种铁路桥荷载及其组合作用下钢筋混凝土岔管及发电机组的应力增量.结果表明,钢筋混凝土岔管及发电机组的应力增量较小,故月山车站改建工程对丹东水电站强度影响较小,不会对水电站的安全运行带来威胁. The FEM software were adopted to establish the 3D mod el of reinforced concrete penstock and generating set of Dandong hydroelectric power station,and its stress increments under each railway bridge load and combination effects were calculated.The result indicated that due to the the stress increments of reinforced concrete penstock and generating set was smaller,the influence of Yueshan station rebuilding project on Dandong hydropower station was smaller,which wouldn′t threaten the safety operation of Dando ng hydroelectric power station.
出处 《华北水利水电学院学报》 2010年第6期43-45,共3页 North China Institute of Water Conservancy and Hydroelectric Power
关键词 岔管 发电机组 应力增量 强度评估 penstock generating set stress increment strength assessment
  • 相关文献

参考文献3

  • 1国家电力公司西北勘测设计研究院,国家电力公司昆明勘测设计研究院,武汉大学.DL/T 5141-2001水电站压力钢管设计规范[S].北京:中国电力出版社,2002. 被引量:1
  • 2铁道部第三勘测设计院.TB10002D1-2005铁路桥涵设计基本规范[S].北京:中国铁道出版社,2005. 被引量:1
  • 3朱伯芳著..有限单元法原理与应用 第2版[M].北京:中国水利水电出版社,1979:607.

同被引文献2

  • 1黄河水利委员会黄河水利科学研究院.月山车站改建工程对丹东电站运行安全影响评估报告,2009,5. 被引量:1
  • 2长安大学工程设计研究院.月山车站改建工程对丹东电站正常运行影响的研究,2009;8. 被引量:1

引证文献1