期刊文献+

Traffic Impact on Incentive Contracting Project Time Performance during Highway Construction

Traffic Impact on Incentive Contracting Project Time Performance during Highway Construction
下载PDF
导出
摘要 The volume of highway traffic in the United States continues to increase. In the face of this there is a concomitant need to improve and repair transportation infrastructure. Construction frequently requires a reduction in capacity during construction activity; consequently road users as well as adjacent businesses must endure the delays and inconveniences associated with transportation construction. Recognizing the problems that construction can produce, state highway agencies (SHAs) have continually sought ways to minimize the negative impact from their construction operations. Incentive contracting has played an important role in this effort to improve project performance. The Florida Department of Transportation (FDOT) is one of the leading SHAs using such innovative contracting methods as Incentive/Disincentive (I/D), A+B (cost plus time bidding) combined with I/D, No Excuse Bonus, and Liquidated Savings. This paper analyzes the traffic impact on incentive project time performance using highway construction projects recently completed in Florida. Project data obtained from FDOT were evaluated using time performance indices. A survey of traffic impact on project work types was performed in Florida in order to evaluate the relationship between construction project types and road traffic influence during construction. Based on the survey results, the 38 most frequently used work types in Florida during the study period were categorized into three traffic impact levels: (1) high traffic impact, (2) medium traffic impact, and (3) low traffic impact. Statistical analysis was performed. The results show that there are significant differences on project time performance between low and high impact levels as well as low and medium impact levels.
作者 Jae-Ho Pyeon
出处 《Journal of Civil Engineering and Architecture》 2010年第7期9-14,共6页 土木工程与建筑(英文版)
关键词 Highway construction project performance traffic impact alternative contracting incentive/disincentive 公路建设项目 交通影响 承包期 奖励 时间 绩效 佛罗里达州 性能指标
  • 相关文献

参考文献13

  • 1Florida Department of Transportation, Alternative contracting user's guide, FDOT Draft Report, Tallahassee, FL, 1997. 被引量:1
  • 2B. W. Workman, Incentives in construction contracts, Master's Thesis, The University of Texas, Texas, 1985. 被引量:1
  • 3Federal Highway Administration, Incentive/disincentive for Early Contract Completion, FHWA Technical Advisory T5080.10, Washington, D.C., 1989, available online at: http://www.fhwa.dot.gov/legsregs/directives/ techadvs/t508010.htm, Apr. 2, 2010. 被引量:1
  • 4R. E. Bierbaum, Incentive/disincentive clauses, Master's Thesis, Iowa State University, Ames, Iowa, 1991. 被引量:1
  • 5Z. J. Herbsman, A + B bidding method - hidden success story for highway construction, Journal of Construction Engineering and Management 121 (1995) 430-437. 被引量:1
  • 6Z. J. Herbsman, W. T. Chen and W. C. Epstein, Time is money: innovative contracting methods in highway construction, Journal of Construction Engineering and Management 121 (1995)273-281. 被引量:1
  • 7D. Arditi, C. J. Khisty and F. Yasamis, Incentive/disincentive provisions in highway contracts, Journal of Construction Engineering and Management 123 (1997) 302-307. 被引量:1
  • 8R. Ellis, J. Pyeon, Z. Herbsman, E. Minchin and K. Molenaar, Evaluation of alternative contracting techniques on FDOT construction projects, Final Report, The Florida Department of Transportation, Tallahassee, FL, July 2007. 被引量:1
  • 9J. Pyeon and T. Park, Improving transportation construction project performance: development of a model to support decision-making process for incentive/ disincentive construction projects, MTI Report 09-07, Mineta Transportation Institute, San Jose, CA, Mar. 2010. 被引量:1
  • 10R. D. Ellis and J. Pyeon, A study of simulation-based contract incentives and disincentives usage, in: Proceedings of the 2005 Construction Research Congress, American Society of Civil Engineers, San Diego, CA, April 5-7, 2005, pp. 527-531. 被引量:1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部