摘要
控制性能评价标准下的自动发电控制策略主要有原有方案的改进型和基于性能评价标准的新设计型。改进型控制策略有利于从旧标准向新标准的过渡,新设计型控制策略更侧重性能评价标准的实现。2个类型的策略各有其特点和相应的适用范围,2个类型策略的发展展望也不相同。
Under the control performance standard(CPS),automatic electric power generation control strategies mainly include two schemes: one is adjustment mode of original scheme,another is new-designed mode based on new standards.The adjustment mode is useful for the transition from old standard to new standard,the new-designed mode places extra emphasis on implementation of CPS.Each of them has own specialty and relevant scope of application;and the development prospects of the two strategies are also different.
出处
《华电技术》
CAS
2011年第3期38-40,74,共4页
HUADIAN TECHNOLOGY
关键词
控制性能评价标准
自动发电控制
PI控制
人工智能
电力可靠性
control performance standard
automatic generation control
proportional plus integral control
artificial intelligence
electric power reliability