摘要
本文结合福州地铁1#线群众路站基坑围护工程实例,详细阐述了三重管高压旋喷桩施工工艺和质量控制,开挖后检验了其施工效果。
By analyzing the bracing of foundation pit of the Qunzhong Road station of Fuzhou subway line one,this thesis elaborates the construction technique and quality control of the triple-tube high-pressure jet pile.The effect of the construction was examined by excavation.
出处
《福建建设科技》
2011年第2期20-22,共3页
Fujian Construction Science & Technology
关键词
三重管旋喷桩
质量控制
漏水原因
防治措施
Triple-tube High-pressure Jet Pile
Quality Control
The Causes of Leakage
Preventing Measures