摘要
长沙市某土质边坡经暴风雨后发生约60m长的滑坡,经分析事故原因为抗滑抗剪能力不足、两次切坡造成阻滑区减小和地勘资料不准等。采用双排桩、重力式挡土墙方案进行综合治理后,历经5年,未出现明显变形、开裂等异常情况。
About 60 m soil slope slide happened in Changsha after a storm. After analysis, this accident was caused by deficient sliding resistance and shearing resistance, inaccurate geological survey and the resistance of the anti-slide segment being reduced after cutting the slope twice, etc. Double-row piles and gravity retaining wall were used for comprehensive treatment and they don't have abnormal conditions, such as obvious deformation and cracking, within 5 years.
出处
《建筑技术》
北大核心
2011年第3期259-261,共3页
Architecture Technology
关键词
土质边坡
滑坡治理
双排桩
soil slope
slope slide treatment
double-raw piles