摘要
对咸宁核电场平开挖工程的不同岩性进行了简述,阐述了不同岩性的开挖施工方法,为今后类似工程开挖施工方案的制定提供参考。
The content of this paper on the nuclear power field level Xianning different rock excavation works were outlined to explain the different lithology Excavating,Excavation for future similar projects provide reference for program development.
出处
《技术与市场》
2011年第3期33-34,共2页
Technology and Market
关键词
不良地质
岩性
施工
unfovrable geological
Lithology
construction