摘要 对印尼苏拉马都跨海大桥9根超长钻孔灌注桩采用自平衡法进行了静载荷试验。测试得到了桩端压浆前后的桩基承载力、桩端阻力及桩侧摩阻力。根据压浆前后的试验数据进行分析,压浆后桩极限承载力提高幅度为10.32%~170%,桩端阻力提高幅度为8.46%~207.6%,侧摩阻力提高幅度为8.32%~120%,整桩承载特性得到明显改善。桩端压浆并不是单独作用于桩端,而是改善了整个桩土体系,使得侧摩阻力也得到大幅增长。压浆后桩端阻力所占桩承载力的比值有所增加,试桩由压浆前的摩擦桩,向端承摩擦桩过渡。另外,压浆量也存在一个合理的数值,需要根据实际地质条件进行压浆设计。 Static load tests are carried out with Osterberg method on nine super-long bored piles formed in Suramadu Bridge.Bearing capacity,base resistance and friction resistance are obtained before and after base grouting.Based on the test results,the ultimate bearing capacity of pile is increased for 10.32%~170%,that of pile base is increased for 8.46%~207.6%,and the frictional resistance is increased for 8.32%~120%,therefore pile bearing behavior is improved.Not only base resistances are improved after grouting,but also frictional resistances are improved by bettering the characteristics of soils and interfaces between piles and soils.After grouting,pile base resistance ratio of pile bearing capacity increased,and the friction pile changed into end-bearing friction pile.In addition,the grouting quantity has a reasonable value,the grouting design needs to be carried out according to practical geologic conditions.
出处 《公路》 北大核心 2011年第2期217-222,共6页 Highway
基金 国家自然科学基金项目 项目编号50908048 江苏省自然科学基金资助项目 项目编号BK2008315
关键词 钻孔灌注桩 承载性能 自平衡测试法 桩端后压浆 摩阻力 端阻力 bored piles bearing capacity Osterberg method pile-base post-grouting frictional resistance base resistance
  • 相关文献

参考文献9

二级参考文献12

  • 1阳吉宝.超长桩荷载传递机理研究[J].岩土工程技术,1997,11(1):25-29. 被引量:19
  • 2翟晋.自平衡测桩法的应用研究[M].东南大学,2000.. 被引量:1
  • 3费鸿庆 王燕 王润吕.黄土地基中超长钻孔灌注桩超高承载力性状试验研究[A]..岩土工程的实践与发展[C].上海:上海交通大学出版社,2000.. 被引量:2
  • 4Bruce D A. Enhancing the performance of large diameter piles by grouting[J]. Grouting Engineering, 1986,19(4):9-15. 被引量:1
  • 5Krubasik K. Ma βnahmen zun Tragkrfterhohung an Groβbohrpfalen Baumashine[J]. Bautechnik,1985,7(8):12-16. 被引量:1
  • 6Bustamante M, Gouvenot D. Grouting: a method improving the bearing capacity of deep foundation[A]. The 8th European Conference on Soil Mechanics and Foundation Engineering [C]. 1983.131-134. 被引量:1
  • 7Osterberg Jori. New device for load testing driven piles and drilled shaft separates friction and end bearing[J]. Piling and Deep Foundations. 1989,1: 421-427. 被引量:1
  • 8Osterberg J O, Hayes J A. The osterberg load cell as a research tool[A]. The XVth International Conference on Soil Mechanics and Geotechnical Engineering[C]. Istanbul, 2001.977-979 被引量:1
  • 9黄生根,曹辉.超长钻孔灌注桩应用后压浆技术的效果分析[J].建筑技术,1999,30(3):178-178. 被引量:12
  • 10陶兴文,吴礼生.钻孔灌注桩后压浆技术在上海地区的试验[J].探矿工程,1999(6):4-5. 被引量:13

共引文献409

同被引文献17

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部