斜拉桥合龙后索力最优调整方法 被引量:1

A Research of Cable Force Optimal Adjustment Method after the Closure of Cable-stayed Bridge
下载PDF
导出
摘要 斜拉桥合龙后,实际的索力与设计目标值存在一定差别,需要进行索力优化。提出一种采用影响矩阵,以满足斜拉桥关键截面可行域为约束条件,采用最小二乘法对合龙后的斜拉桥索力进行调整量计算,精确考虑调索顺序对张拉索力影响,实现索力最优调整的方法。算例表明,采用该方法进行合龙后索力最优调整,具有很好的控制效果和很高的计算效率。 After the closure of cable-stayed bridge,the practical cable force will be different from the designed value,therefore,cable force optimization is necessary.A kind of influence matrix method is put forward to meet the requirement of bridge key section feasible region being constraint condition;least square method is adopted to make adjustment calculation on cable force after the closure of cable-stayed bridge.Considering the influence of adjusting cable order on tensile cable force accurately is to realize the optimal adjustment method.The example shows that the method is of great controlling effect and high calculation efficiency.
作者 吴斌暄
出处 《中国市政工程》 2011年第1期52-53,57,共3页 China Municipal Engineering
关键词 斜拉桥 索力最优调整 影响矩阵法 可行域 最小二乘法 cable-stayed bridge cable force optimal adjustment influence matrix method feasible region least square method
  • 相关文献

参考文献1

二级参考文献6

共引文献195

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部