期刊文献+

预应力混凝土曲线连续刚构桥梁悬灌施工中线型控制方法 被引量:24

A GEOMETRIC CONTROL METHOD FOR FREE CANTILEVER CASTING CONSTRUCTION OF PC CONTINUOUS RIGID BRIGE
下载PDF
导出
摘要 研究了预应力混凝土曲梁桥悬灌施工中线型控制方法。在考虑了不同时间悬灌混凝土梁段徐变变形的条件下,提出了在两种坐标系中悬臂灌筑主梁时各梁段线型调整参数的计算公式。介绍了用所建立的方法对南昆铁路板其二号大桥实施线型控制的效果:既保证了合拢精度,又达到了成桥线型与目标线型的吻合。 The geometric control method for fine cantilever casting construction of PC curved girder bridge are studied in this paper. Taking into consideration of the creep displacement of concrete of the beam segments casted in different times, the calculating formulas of the geometric adjustment parameters of each beam segment in both coordinates during the stage of free cantilever casting construction of girder are proposed. The geometric control result of an actual curved girder bridge, the Banqi - 2 Bridge of Nanning - Kunming Railway, using the developed method is introduced. Die to the effect of the geometric control, the precision of the joining of bridge segments is ensured, and the ultimate geometry of the bridge line coincides well with that of the objective one.
机构地区 兰州铁道学院
出处 《土木工程学报》 EI CSCD 北大核心 1999年第4期51-56,共6页 China Civil Engineering Journal
关键词 预应力混凝土 曲梁桥 线型监控 悬灌施工 刚构桥 PC curved girder bridge, geometric control, be cantilever casting construction
  • 相关文献

参考文献11

二级参考文献8

  • 1刘世忠,兰州铁道学院学报,1994年,13卷,1期 被引量:1
  • 2包世华,薄壁杆件结构力学,1991年 被引量:1
  • 3郭在田,薄壁杆件的弯曲与扭转,1989年 被引量:1
  • 4陈伯真,薄壁结构力学,1988年 被引量:1
  • 5周贤彪,哈尔滨建筑工程学院学报,1987年,20卷,1期 被引量:1
  • 6唐家祥,土木工程学报,1987年,20卷,2期 被引量:1
  • 7黄剑源,薄壁结构的扭转分析.上,1983年 被引量:1
  • 8赵超燮,结构矩阵分析原理,1983年 被引量:1

共引文献24

同被引文献64

引证文献24

二级引证文献60

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部