印度海萨2×600MW机组调试中的主要问题及分析 被引量:2

Analysis on the Principal Problems Encountered During Commissioning of the Indian HISAR 2×600MW Project
原文传递
导出
摘要 印度海萨2×600MW火电机组工程的调试包括整套启动调试及预调试指导,调试过程问题多,困难大,试运过程不顺利,致使调试时间长、风险大。原因是印度火电建设工程的现实环境不佳,中印工程管理理念有差异,存在许多问题,如:安装进度慢、质量差;没有组织指挥机构,双方协调及配合困难;不遵守调试和操作规程;运行水平低,安全风险高;技术支持困难、设备问题多等。通过中印双方不断总结和改进,逐步克服了调试期间的这些问题,完成了机组的调试任务。 Commissioning of the Indian HISAR 2×600 MW project mainly includes unit startup commissioning and trial commissioning instructions.Many problems and difficulties are encountered during commissioning,which led to long commissioning duration and huge risks.The causes for above problems include the poor environment for thermal power construction in India,the conception difference between Chinese and Indian project management,slow construction progress and poor quality;no leading organization institution,difficulty in mutual coordination and cooperation;nonobservation of commissioning and operation regulations;poor operation ability,high safety risk,poor technical support and many equipment problems.Through continuous improvement by both partners,the above problems were gradually overcome during commissioning and eventually the unit commissioning task was completed.
出处 《电力建设》 2011年第2期92-95,共4页 Electric Power Construction
关键词 600MW机组 调试模式 调试内容 试运 电气设备 操作规程 600 MW unit commissioning mode commissioning content trial run electric equipment operation regulation
  • 相关文献

参考文献4

  • 1赵常兴.汽轮机组技术于册[M].北京:中国电力出版社,2007. 被引量:2
  • 2黄雅罗,黄树红主编..发电设备状态检修[M].北京:中国电力出版社,2000:247.
  • 3胡荫平主编..电站锅炉手册[M].北京:中国电力出版社,2005:1047.
  • 4黄新元.电站锅炉运行与燃烧调整[M].北京:中国电力出版社,2002.. 被引量:33

共引文献33

同被引文献7

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部