摘要 为研究亭子口水电站厂坝间设置垫层管的可行性,以厂房坝段、厂房以及钢管为研究对象,采用三维有限元仿真计算技术模拟厂房坝段以及厂房的浇筑和运行过程,计算得到厂坝间相对位移及垫层管段钢管等效应力。计算结果表明,厂房蜗壳内设置止推环时,运行期高温季节垫层管的等效应力将大于钢材允许应力,如果采用垫层管方案,需采取必要的结构或工程措施以减小垫层管段的应力。 In order to study the feasibility of setting up a cushion pipe between the dam and the powerhouse of Tingzikou Hydropower Station,the dam,the powerhouse and the steel pipe were discussed.By use of 3D FEM simulation, the concrete placing process of the dam and powerhouse was simulated.The relative displacement between the dam and the powerhouse and the equivalent stress of the cushion pipe were calculated.The results indicate that the equivalent stress of the cushion pipe is larger than its allowable stress in hot season if the thrust ring is set in the spiral casing.In order to reduce the stress of the cushion pipe,some structural or technical measures should be taken when the cushion pipe is used.
出处 《水利水电科技进展》 CSCD 北大核心 2011年第1期50-53,共4页 Advances in Science and Technology of Water Resources
基金 中央级公益性科研院所基本科研业务费(YWF0908) 水利部公益性行业科研专项(200901066) "十一五"国家科技支撑计划(2006BAB04A01) 国家自然科学基金(50539010)
关键词 三维有限元法 垫层管 止推环 亭子口水电站 3D FEM cushion pipe thrust ring Tingzikou Hydropower Station
  • 相关文献

参考文献7

二级参考文献21

共引文献30

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部