摘要
分析了柳洪水电站发电机转子磁极引线接头烧毁和导电铜排存在裂纹的原因,提出了处理措施和应吸取的经验教训。
In accordance with problems of the hydrogenerator in Liuhong Power Plant,explained the causes of damaged lead wire of rotor magnetic pole and crack of conductive copper row,and relevant technical measures of treatment and precaution are put forward.