Construction of SECRAL LHe Station
Construction of SECRAL LHe Station
-
1Sun Liangting,Zhao Hongwei,Zhang Xuezhen,Zhang Zimin,Guo Xiaohong,He Wei,Li Jinyu,Feng Yucheng,Cao Yun,Wang Hui,Ma Baohua,Li Xixia,Zhao Huanyu,Shang Yong,Lu Wang,Li Jie,Yuan Pin,Song Mingtao,Zhan Wenlong,Wei Baowen,D. Z. Xie.Report of Training and Commissioning Results of SECRAL[J].近代物理研究所和兰州重离子加速器实验室年报:英文版,2005(1):174-175.
-
2Sun Liangting,Zhao Hongwei,Zhang Xuezhen,Guo Xiaohong,He Wei,Zhang Zimin,Li Jinyu,Feng Yucheng,Cao Yun,Wang Hui,Ma Baohua,Li Xixia,Zhao Huanyu,Shang Yong,Lu Wang,Li Jie,Yuan Pin,Song Mingtao,Zhan Wenlong,Wei Baowen,D. Z. Xie.Preliminary Results of SECRAL at 18 GHz[J].近代物理研究所和兰州重离子加速器实验室年报:英文版,2006(1):149-149.
-
3Wang Yanyu Zhou Detai Zhou Wenxiong Zhang Jianchuan Li Yingtang Lin Fuyuan Feng Yucheng Lu Wang.Monitor and Control System for SECRAL Ion Source[J].IMP & HIRFL Annual Report,2011(1):207-208. 被引量:1
-
4FengYucheng Lu Wang Li Jinyu Zhang Wenhui Ma Hongyi Ma Baohua Wang Hui Li Jiaqing Lin Shuhao Cao Yun Sha Shan W u Qi Guo Junwei Fang Xing Yang Yao Li Xixia Zhang Hengjuan Zhao Huanyu Zhang Xuezhen Sun Liangting Zhao Hongwei.6 - 18 Operation Status of On-line Ion Sources in 2012[J].IMP & HIRFL Annual Report,2012(1):261-262. 被引量:1
-
5A Multi-parameter Data Acquisition Based on Alpha Station 255/300[J].IMP & HIRFL Annual Report,1998(0):67-67.
-
6Zhao Huanyu Zhao Hongwei Ma Xinwen Sun Liangting Zhang Xuezhen Li Xixia Wang Hui Ma Baohua Cao Yun Feng Yucheng Zhu Yuhua Shang Yong.Measurement of Bremsstrahlung Spectra on SECRAL[J].近代物理研究所和兰州重离子加速器实验室年报:英文版,2006(1):158-159.
-
7Guo Xiaohong Jin Tao.Progress of Helium Recycle System for Superconducting ECR Ion Source[J].近代物理研究所和兰州重离子加速器实验室年报:英文版,2007(1):183-183. 被引量:1
-
8赵环昱,赵红卫,马新文,孙良亭,张雪珍.超导ECR源SECRAL轫致辐射谱的测量[J].核技术,2007,30(12):975-978.
-
9周志斌,李国伟,石锋.应用LHE水质稳定剂实现循环冷却水零排放[J].化肥工业,2010,37(6):51-54.
-
10Zhao Huanyu Zhao Hongwei Sun Liangting Zhang Xuezhen.Production of EUV Power with SECRAL[J].近代物理研究所和兰州重离子加速器实验室年报:英文版,2006(1):160-160.