摘要
以某实际工程为例,针对该工程桩基承载力不合格的情况进行了分析,阐述了出现问题的原因,介绍了PHC管桩施工监理控制要点,包括焊接、桩锤、打桩顺序、养护等几方面,对今后同类PHC管桩工程具有一定指导意义。
Taking some factual project as the example, the paper analyzes the unqualified loading capacity of the pile foundation in the project, illustrates the reasons for the problems, and introduces the supervision control points of PHC pipe pile, including welding, pile hammer, piling sequence, and maintenance and so on, so as to have the direction significance for the similar PHC pipe pile projects.
出处
《山西建筑》
2011年第6期199-200,共2页
Shanxi Architecture
关键词
PHC管桩
承载力
监理要点
PHC pipe pile, loading capacity, supervision points