摘要 介绍了四种辅助沉桩的方法,即水冲法、掏土法、同步注浆静压预制桩沉桩方法和静压沉管扩底混凝土预制桩的施工方法,并对四种方法的原理及应用情况作了阐述,实践证明:这些方法可以提高施工质量,克服静压桩沉桩困难的缺点,扩大静压桩使用范围,降低工程造价。 The paper introduces the four auxiliary sinking piles,that is the jetting method,the soil removal method,the simultaneous grouting static pressure precast pile's sinking pile method and the static pressure sinking pipe concrete precast pile,illustrates the principles for the four methods and their application,and proves these methods can improve the construction quality,overcome the disadvantages of the sinking pile difficulties for the static pressure pile,enlarge the application scopes of the static pressure pile,and reduce the engineering costs.
作者 田利民
出处 《山西建筑》 2011年第5期67-68,共2页 Shanxi Architecture
关键词 静压桩 辅助沉桩方法 掏土法 水冲法 static pressure pile auxiliary sinking pile method soil removal jetting method
  • 相关文献

参考文献4

二级参考文献2

共引文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部