摘要
为解决国外工程中控制测量的UTM投影问题,结合缅甸乌托水电站测绘实例,研究了UTM投影正反解和UTM投影变形,并给出了解决方案。
To deal with the UTM projection issue in control survey for overseas projects,this paper researches,based on the survey for Wutsok hydropower project in Myanmar,the positive negative solutions and UTM projection deformation,and gives the solution.
出处
《西北水电》
2010年第6期7-9,共3页
Northwest Hydropower
关键词
UTM投影
正反解公式
投影变形
UTM projection
positive and negative solution formula
projection deformation