摘要 对某既有钢筋混凝土拱肋的试验结果进行了较详尽的研究。首先基于静力和模态试验得出,既有拱肋的刚度并非一致下降,而具有波动变化的特征。然后基于模型修正技术,通过不断调整结构刚度参数以获得与试验结果相一致的策略,计算了该拱肋的初始刚度分布和加载各阶段的刚度分布。在此基础上研究了既有钢筋混凝土拱肋破坏过程中内力变化的一些规律。最后利用这些成果进行了极限荷载验证。结果表明基于内力变化规律来推求极限荷载的方法具有较高精度。 Experimental results were studied in detail for an existing reinforced concrete arch rib.Based on the static and modal experimental results,it is found that the stiffness of the existing reinforced concrete arch rib reduces not consistently but holds the characteristic of fluctuation.Then the stiffness distributions of the arch rib in the initial state and each loading step were calculated with the strategy that the calculated results should be consistent with the test results through model updating.On this basis,some conclusions on the internal force change in the failure process of the existing reinforced concrete arch ribs were obtained.Finally,the ultimate load verification was performed with the application of these conclusions.The result shows that the method for obtaining the ultimate load with the law of internal force changes is accurate.
出处 《公路交通科技》 CAS CSCD 北大核心 2011年第1期68-73,共6页 Journal of Highway and Transportation Research and Development
基金 交通部西部交通建设科技资助项目(200631800019) 长沙理工大学桥梁与隧道工程重点学科基金资助项目 湖南省科技计划项目(2010FJ3172)
关键词 桥梁工程 钢筋混凝土拱肋 模型修正 极限承载能力 损伤 bridge engineering reinforced concrete arch rib model updating ultimate bearing capacity damage
  • 相关文献

参考文献10

  • 1ENRIGHT M P, FRANGOPOL D M. Survey and Evaluation of Damaged Concrete Bridges [ J ]. Journal of Bridge Engineering, ASCE, 2000, 5 (1) : 31 -38. 被引量:1
  • 2NOWAK A S, KIM S J, STANKIEWICZ P R. Analysis and Diagnostic Testing of a Bridge [ J]. Computers & Structures, 2000, 77 ( 1 ) : 91 - 100. 被引量:1
  • 3BROWN JOHN J M W, MOYO P, OMENZETFER P, et al. Assessment of Highway Bridge Upgrading by Dynamic Testing and Finite Element Model Updating [ J]. Journal of Bridge Engineering, 2003, 8 (3) : 162 - 172. 被引量:1
  • 4MOLLER B, GRAF W, BEER M. Safety Assessment of Structures in View of Fuzzy Randomness [ J]. Computers & Structures, 2003, 81 (15) : 1567 -1582. 被引量:1
  • 5ZHAO Zhiye, CHEN Chuanyu. A Fuzzy System for Concrete Bridge Diagnosis [ J]. Computers & Structures, 2002, 80 (8) : 629 - 641. 被引量:1
  • 6蒋友宝,刘扬,张建仁.钢筋混凝土拱基于模态频率的承载能力评估[J].公路交通科技,2009,26(8):63-66. 被引量:3
  • 7钟惠萍..既有钢筋混凝土桥梁构件耐久性试验与可靠性评估研究[D].长沙理工大学,2004:
  • 8ZHANG Jianren, LI Chuanxi, XU Feihong, et al. Test and Analysis for Ultimate Load-carrying Capacity of Existing Reinforced Concrete Arch Ribs [ J ]. Journal of Bridge Engineering, ACSE, 2007, 12 ( 1 ) : 4 - 12. 被引量:1
  • 9奉龙成,罗小华.钢筋混凝土拱桥面内极限承载能力的非线性分析[J].土木工程学报,2002,35(3):20-24. 被引量:21
  • 10叶见曙,张峰.预应力混凝土连续箱梁开裂后的刚度退化模型[J].中国公路学报,2007,20(6):67-72. 被引量:31

二级参考文献19

共引文献50

同被引文献19

  • 1张劲泉,李万恒,程寿山,李湛.基于检测结果的既有桥梁承载能力评定方法研究[J].公路交通科技,2006,23(S1):30-32. 被引量:29
  • 2JTGD60-2004.公路桥涵设计通用规范[S].[S].,.. 被引量:1583
  • 3Suo Q H,Stewart M G. Corrosion cracking prediction updating of deteriorating RC structures using inspection information[J]. Reliability Engineering&System Safety, 2009,94(8) : 1340-1348. 被引量:1
  • 4Nowak A S, Kim S J, Stankiewicz P R. Analysis and diagnostic testing of a bridge[J]. Computers & Structures ,2000,77(1) :91-100. 被引量:1
  • 5Brownjohn J M W, Moyo P, Omenzetter P, et al. Assessment of highway bridge upgrading by dynamic testing and finite element model updating[J]. Journal of Bridge Engineering, 2003,8(3) : 162-172. 被引量:1
  • 6Stramandinoli Renata S B,Rovere Henriette L La. An efficient tension-stiffening model for nonlinear analysis of reinforced concrete members[J]. Engineering Structures ,2008,30 (7) :2069-2080. 被引量:1
  • 7Zhang J R, Li C X,Xu F H,et al. Test and analysis for ultimate load-carrying capacity of existing reinforced concrete arch ribs[J]. Journal of Bridge Engineering, ACSE, 2007,12 (1) : 4-12. 被引量:1
  • 8SUO Q H, STEWART M G. Corrosion Cracking Prediction Updating of Deteriorating RC Structures Using Inspection Information [ J ]. Reliability Engineering & System Safety, 2009, 94 (8) : 1340 -1348. 被引量:1
  • 9JTG/TJ21-2011,公路桥梁承载能力检测评定技术规程[S]. 被引量:2
  • 10BROWNJOHN J M W, MOYO P, OMENZETrER P, et al. Assessment of Highway Bridge upgrading by Dynamic Testing and Finite Element Model Updating [ J ]. Journal of Bridge Engineering, 2003, 8 (3) : 162 - 172. 被引量:1

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部