摘要
针对琅琊山抽水蓄能电厂4号发电机突然深度进相故障进行了分析,详细描述了突然深度进相故障的过程,分析了深度进相故障的原因,提出了处理故障的具体措施,实践证明措施是可行的。
A sudden depth leading phase failure of No.4 unit in Langyashan Pumped Storage Power Station was analyzed.The process of this sudden depth leading phase failure was described in detail and the reasons were analyzed.The specific measures to deal with the failure were proposed,which were proved to be feasible in practice.
出处
《华东电力》
北大核心
2010年第11期1830-1831,共2页
East China Electric Power
关键词
同步发电机
突然深度进相故障
措施
synchronous generator
sudden depth leading phase failure
measures