摘要
根据木槽岩隧道穿越区地质条件和实际施工情况,施工中采取了超前支护、分步开挖、稳步推进的方法,并增加了超前小导管及锁脚小导管、锁脚锚杆等支护方式,加强测量观测工作,避免不良地质给施工造成的损失。
Based on the geological and construction conditions of Mucaoyan tunnel,the paper adopted advanced support,step-by-step excavation,advanced steady method,and increased the advanced small catheter,lock small feet catheter and lock feet anchor supporting way etc,strengthened the measurement and avoided the losing due to bad geology.