期刊文献+

临床课题结题相关因素对高水平成果产出的影响分析 被引量:1

Impact Analysis between Clinical Topics Concluding Related Factors and High Qualified Result Products
下载PDF
导出
摘要 在课题组承担课题研究与结题的层面,调查近10年来广州医学院7个直属医院的获奖成果和结题项目情况,分析高水平科研成果产出与课题结题因素的关系。认为"研究有关键问题的突破"、"研究结果创新性强、达到国内领先水平"、"研究结果推广被广泛公认"、"研究结果临床应用作用大、效益好"、"有省部以上重点基地依托和单位的有力支持"等为影响高水平成果产出的主要因素,并提出促进高水平成果产出的临床课题结题要素的管理模式。 The scientific research product data and scientific project closure situation of seven affiliated hospitals of Guangzhou Medical College are researched,then the relationship between high qualified scientific research products and project research related factors is analyzed.It is concluded that "Research on key points","Better prospective subjects of higher creativity which reach domestic advanced level","Better clinical application,better research base",and "Strong support from key base above province-ministry and units" are the major factors which impact high qualified scientific research products,and the management model of clinical concluding subjects of promoting high-level product is proposed.
出处 《中国医院管理》 2010年第12期72-73,共2页 Chinese Hospital Management
基金 广东省自然科学基金(34650) 广州市软学科项目(2003Y1-H0221) 广东省卫生厅项目(A2003287)
关键词 临床研究 相关因素 成果 产出 clinical research related factors result product
  • 相关文献

参考文献2

  • 1黄秀峰.论医学科技突破.中华医学科研管理杂志,1998,11(4):203-205. 被引量:2
  • 2曾玉华 孟渠成 王银华 等.获奖成果水平与研究经费的相关分析(附178科研成果分析).当代医师杂志,1997,2(4):62-63. 被引量:4

共引文献3

同被引文献21

  • 1刘民,蒋宁,王昱,李俊勇,周丽,段钟平,李三军.医学科研项目实施过程评价指标体系的可靠性和真实性评价[J].中华医学科研管理杂志,2006,19(5):264-267. 被引量:5
  • 2邹超,朱光伟,姜澄宇.重大科研项目风险管理探讨[J].西北大学学报(哲学社会科学版),2007,37(4):174-176. 被引量:22
  • 3马歆卉.科研项目全过程管理[J].现代商贸工业,2007,19(5):73-74. 被引量:6
  • 4郑红蕾.基于科研项目全生命周期的里程碑式管理模式[J].国科教创新导刊,2008(25):112-114. 被引量:1
  • 5MARIO VANHOUCKE. On the dynamic use of project performance and schedule risk information dining project tracking J ]. Omega, 2011, 39 : 416-426. 被引量:1
  • 6P PATANAKUL, D MILOSEVIC. A competency model for effective-ness in managing multiple projects [ J ]. Journal of High Technology Management Research, 2008, 18 : 118 - 131. 被引量:1
  • 7CHUNG - YEE LEE, LEI LEI. Multiple - Project Scheduling with Controllable Project Duration and Hard Resource Constraint: Some Solvable Cases [J]. Annals of Operations Research, 2001, 102: 287 - 307. 被引量:1
  • 8BYUNG- CHEOL KIM, KENNETH F. Reinschmidt. Probabilistic Forecasting of Project 24. Duration Using Bayesian Inference and the Beta Distribution [ J]. Journal Of Construction Engineering And Management, 2009 (March) : 178 - 186. 被引量:1
  • 9MARIO VANHOUCKE. On the dynamic use of project performance and schedule risk information during project tracking [ J]. Omega, 2011, 39:416-426. 被引量:1
  • 10M VANHOUCKE. Measuring the efficiency of project control using fictitious and empirical project data. International [ J ]. Journal of Project Management , 2012, 30 : 252 - 263. 被引量:1

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部