摘要
介绍火电厂烟气脱硫装置的系统组成、安装工艺及特点、施工进度计划和质量控制检查等,并对烟气脱硫装置的施工提出合理的施工工序,以确保施工工期和施工质量,有效控制施工成本。
This article introduces system composition, installation procedure and features, construction progress as well as QcP (quality control plan) for flue gas desulfurization facilities. Furthermore a practical construction process for flue gas desulfurization is specified, which will help to complete construction on time, guarantee construction quali .ty and save cost during construction.
出处
《安徽电力》
2010年第4期59-62,共4页
Anhui Electric Power
关键词
火电厂
烟气脱硫装置
吸收塔
施工
安装工艺
thermal power plant
flue gas desulfurization facilities
absorption tower
construction
installation procedure